Hayters came out this morning, cheerfully tightened the joint that wasn't tight enough (condensation not being channelled properly), inspected everything, and left again. No drip. Heat working. Can I breathe a sigh of relief yet?!
Friday, November 27, 2020
Subscribe to:
Post Comments (Atom)
-
We've had a little more time now to figure some things out about this church of ours. Built in 1939, the United Church functioned and ...
-
The ground has settled around the areas where we had the foundations excavated and waterproofed, and somehow water is still getting in here ...
-
The limestone screening is in, and the wheelbarrow has been lashed down under a tarp. The overflow pipe by the eavestroughs is duly capped. ...
No comments:
Post a Comment