Friday, November 27, 2020

All done!

Hayters came out this morning, cheerfully tightened the joint that wasn't tight enough (condensation not being channelled properly), inspected everything, and left again. No drip. Heat working. Can I breathe a sigh of relief yet?!

No comments:

Post a Comment

A Busy Day and a Hygge Sort of Evening

The limestone screening is in, and the wheelbarrow has been lashed down under a tarp. The overflow pipe by the eavestroughs is duly capped. ...