I ended up coming up to the church this week with my husband to help remove the stained glass. This morning Stephenson showed up and began installation. It's all very noisy and exciting and will make a dramatic difference, not just cosmetically but hopefully to the heat-retention of the building. I'm already loving the sunlight coming in.
Subscribe to:
Post Comments (Atom)
A Lazy Week
A lazy week at the church, doing puzzles, watching The Chosen , reading Ann Patchett, and taking long walks. My friend Sheri, whom I've ...
-
Thank you to Scott and to Brian and James, father-son team from ABC Flooring, for a fast, mess-free job so far! We've decided the plain...
-
We won't be coming up to meet the repairman after all, because the engine light has come on and the heater has stopped working, and we k...
No comments:
Post a Comment