I ended up coming up to the church this week with my husband to help remove the stained glass. This morning Stephenson showed up and began installation. It's all very noisy and exciting and will make a dramatic difference, not just cosmetically but hopefully to the heat-retention of the building. I'm already loving the sunlight coming in.
Subscribe to:
Post Comments (Atom)
-
We've had a little more time now to figure some things out about this church of ours. Built in 1939, the United Church functioned and ...
-
The ground has settled around the areas where we had the foundations excavated and waterproofed, and somehow water is still getting in here ...
-
The limestone screening is in, and the wheelbarrow has been lashed down under a tarp. The overflow pipe by the eavestroughs is duly capped. ...
No comments:
Post a Comment